Assessment of Contract Change Orders and Their Impact on Contractor Performance in Construction Projects
Keywords:
Construction Project Management, Contract Change Order, Cost Overrun, Time Overrun, Variation OrderAbstract
Contract Change Orders (CCOs) are a major challenge in construction projects, directly impacting cost, time, and quality. Contract changes can occur at various stages of project implementation and are influenced by a variety of technical and non-technical factors. This study aims to identify the causes, impacts, and control strategies for CCOs by analyzing 30 scientific articles from Google Scholar. The method used was a literature review, selecting relevant journals based on keywords, topic suitability, and completeness of research information. The analysis results indicate that the main causes of CCOs include mismatches between design and field conditions, planning errors, incomplete technical specifications, additional owner-scope of work, and external factors such as weather, material price increases, and policy changes. The impact of CCOs appears significant on cost overruns and time overruns, with some projects experiencing contract value increases of more than 25% and delays of more than 30%. In addition, CCOs also affect productivity, work quality, and the potential for disputes between parties. This study emphasizes the importance of thorough planning, high-quality design documents, inter-stakeholder coordination, and the use of analytical methods in change management as mitigation strategies to minimize the frequency and impact of CCOs. These findings are expected to serve as a reference for academics and practitioners seeking to improve the effectiveness of construction project management.
Downloads
References
Alhilli, H. K., & Rezoqi, S. I. (2021). Investigating variation orders causes in Iraqi building construction projects. E3S Web of Conferences, 318, 02003.
Alzara, M. (2022a). Exploring the impacts of change orders on performance of construction projects in Saudi Arabia. Advances in Civil Engineering, 2022(1), 5775926.
Alzara, M. (2022b). Exploring the Impacts of Change Orders on Performance of Construction Projects in Saudi Arabia. Advances in Civil Engineering, 2022. https://doi.org/10.1155/2022/5775926
CCO, C. C. O. (n.d.). IDENTIFIKASI DAN ANALISIS SEBAB AKIBAT CONTRACT CHANGE ORDER TERHADAP BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI.
Devedo, M. G., & Lestari, D. A. (2025). Analysis of Contract Change Order (CCO) in the Samarinda Road Preservation Project. JSE Journal of Science and Engineering, 3(2), 66–73.
Elssyadiana, K. M. E., Suardika, I. N., & Yuliana, N. P. I. (2024). Analisis Pengaruh dan Penyebab Contract Change Oreder (CCO) Terhadap Waktu Pelaksanaan Pada Proyek Pembangunan Gedung Kantor (DPMPTSP, Disnaker, Diskes, dan Capil) Kabupaten Gianyar. Prosiding Seminar Nasional Ketekniksipilan Bidang Vokasional, 3(1), 779–787.
Firdaus Alrizal, F., Choiriyah, S., & Alfiana, F. (2023). Analisis Pengaruh Penyebab Change order pada Pembangunan Apartemen Bess Mansion. Jurnal EXTRAPOLASI.
Hansen, S., & Nindartin, A. (2022). Profiling Contract Change Order Disputes: An Empirical Validation Study. International Journal of Construction Supply Chain Management, 12(2), 16–31.
Kartini, D. A., & QA, G. R. (2024). THE CONTRACT CHANGE ORDER ANLYSIS OF BRIDGE CONTRUSTION EMPLOYEES OF BIG HALL PROJECTS IMPLEMENTATION OF NATIONAL ROAD WHICH INFLUENCES THE TIME PERFORMANCE. Journal of Industrial Engineering & Management Research, 5(2), 31–41.
Khalim, M. A., Adi, H. P., & Rochim, A. (2021). Analisis Contract Change Order Pada Pelaksanaan Proyek Apartemen Alton Semarang. Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 26(2), 222–234.
Khoso, A. R., Khan, J. S., Faiz, R. U., & Akhund, M. A. (2019). Assessment of change orders attributes in preconstruction and construction phase. Civil Engineering Journal, 5(3), 616–623.
Kurniawan, I., & Garside, A. K. (2021). IDENTIFIKASI DAN ANALISIS SEBAB AKIBAT CONTRACT CHANGE ORDER TERHADAP BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI. Seminar Keinsinyuran, 2797–1775.
Lin, C.-L., & Lai, Y. C. (2020). Evaluating the Pricing Strategy for Change Orders between General Contractors and Subcontractors Using ET-SD Model.
Mangampa, M. I. S., Latupeirissa, J. E., & Tiyouw, H. C. P. (2022). Analisis Contract Change Order Terhadap Waktu pada ProyekPembangunan Stasiun Kereta Api Makassar-Pare pare. Paulus Civil Engineering Journal, 4(3), 444–451.
Martanti, A. Y. Y. (2018). Analisis faktor penyebab contract change order dan pengaruhnya terhadap kinerja kontraktor pada proyek konstruksi pemerintah. Rekayasa Sipil, 7(1), 32–42.
Maulana, A. (2016). Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi Pembangunan Bendung. Jurnal Infrastruktur, 2(2), 40–51.
Msiska, U., & Mashwama, N. (2022). Impact of Variation Orders on Construction Project Cost and Time. Proceedings of the International Conference on Industrial Engineering and Operations Management Nsukka.
Nurisra, N., Mubarak, M., Mahmuddin, M., & Hariska, M. R. (2024). The Potential Causes of Contractual Change Orders Sourced from the Construction Phase of the Building Project. E3S Web of Conferences, 476, 01055.
Nusantara, B. P. (2022). Evaluasi penerapan contract change order sebagai solusi permasalahan perubahan lingkup kontrak (studi kasus: Proyek Simpang Susun Balaraja Timur Pada Tol Jakarta-Merak, Kabupaten Tangerang). THESIS-2022.
Putri, C. G., Rimawan, E., Rachman, L. A., & Utomo, P. M. (2020). Causes of Variation Order and the Impact on Project Cost Building in Sudirman. Int. J. Innov. Sci. Res. Technol, 5(7), 356–363.
Qomariah, D. L., & Susetyo, B. (2024). Analysis of the effect of contract change order factors on the performance of road facility projects. Jurnal Pensil: Pendidikan Teknik Sipil, 13(2), 183–192.
Rezouki, S. E. (2022). The causes influencing the occurrence of variation orders in the construction of buildings. Journal of Engineering, 28(8), 34–53.
Sayfuddin, S., & Syakirin, S. (2024). Analysis Study of Change Contract Order (CCO) Management on Construction Project Implementation Performance in Central Lombok Regency. Asian Journal of Engineering, Social and Health, 3(4), 785–791.
Setiawan, I., & Riantini, L. S. (2021). Risk Evaluation Causes of Contract Change Order to Improve Cost Performance on Railway Construction Project. United International Journal for Research & Technology, 2(9), 10–14.
Setyawan, P. A., Wardani, A. A. A. C., & Putra, C. (2020). Evaluasi Faktor Penyebab Terjadinya Contract Change Order (CCO) Pada Proyek The Hava Villa. Widya Teknik, 13(01), 9–18.
Simon-Eigbe, B. O., Aiminhiefe, M. I., & Bamidele, B. O. (2022). Factors affecting project performance of building construction projects in federal capital territory (FCT) Abuja, Nigeria. Curr. J. Appl. Sci. Technol, 41, 44–53.
Sukardi, I. M., & Biantoro, A. W. (2025). Analysis of Contract Change Order (CCO) Factors, which Affect the Fly Over Work (Case Study of The Cisauk Fly Over Development Project). ASTONJADRO, 14(1), 133–141.
Tobing, P. R. (2025). Analysis of The Influence of Change Contract Order, Labor, Materials and Tools on the Performance of the Implementation Time Low-Rise State Building Project. Eduvest-Journal of Universal Studies, 5(8), 9632–9649.
Waney, E. Y. V, Wala, M. M., & Kapoh, H. (2017). Development of model for controlling contract change order in pier project (case study in north sulawesi, Indonesia). ARPN J. Eng. Appl. Sci, 12, 1359–1368.
Wardani, A. A. A. M. C., Laintarawan, I. P., & Arianta, I. G. A. (2023). Analisis faktor penyebab contract change order (cco) terhadap proses pelaksanaan pembangunan gedung rumah sakit kabupaten bangli. Widya Teknik, 19(1), 1–9.
Wibowo, W. P., Witjaksana, B., & TJendani, H. T. (2023). Analysis of Contract Change Order (Cco) Costs in Building Construction Projects. Asian Journal of Engineering, Social and Health, 2(12), 1719–1732.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Proceedings of International Conference of Graduate School on Sustainability

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish in this journal agree to the following terms: Proceeding of International Conference of Graduate School on Sustainability is licensed under Creative Commons Attribution-ShareAlike 4.0 International. Creative Commons Attribution-ShareAlike 4.0 International License (CC BY 4.0) is applied when mandated by research funders, such as those who have signed. Open Access articles in Jurnal Cakrawala Hukum are published under theCreative Commons Attribution-ShareAlike 4.0 International (CC BY 4.0) license. The copyright of the received article shall be assigned to the journal as the publisher of the journal. The intended copyright includes the right to publish the article in various forms (including reprints). The journal maintains the publishing rights to the published articles. Authors must agree to the copyright transfer agreement by checking the Copyright Notice column at the initial stage when submitting the article.



