Analysis of Labor Productivity on Lightweight Brick Masonry Work Using the Work Sampling Method

Authors

  • Naufal Luthfi Fadillah Universitas Pembangunan Nasional "Veteran" Jawa Timur
  • I Nyoman Dita Pahang Putra Universitas Pembangunan Nasional "Veteran" Jawa Timur

DOI:

https://doi.org/10.26905/cjce.v3i2.13097

Keywords:

Labor, Productivity, Work Sampling

Abstract

One of the important elements in the construction process is lightweight brick work. Labor productivity in this work is very influential on the progress of the construction project as a whole. One method that can be applied to analyze labor productivity is work sampling, which is an observation method used to measure and analyze the productivity of workers or activities at a certain time. This study aims to investigate and analyze labor productivity of lightweight brick work labor. The work sampling method was chosen to analyze the productivity and quantity of labor in lightweight brick work on the Bekasi Mixed Use Development Pakuwon Residence project. Based on the analysis and discussion during the 10-day observation period, 8 lightweight brick masonry workers completed work with a total area of 658.480 m2 and obtained a productivity value of 52,730 m2/day. In addition, from the results of field observations, the level of worker adjustment factors and allowances can still be increased, with the hope that this increase will significantly increase worker productivity in terms of time, quality, and quantity.

Author Biography

Naufal Luthfi Fadillah, Universitas Pembangunan Nasional "Veteran" Jawa Timur

Teknik Sipil, Universitas Pembangunan Nasional "Veteran" Jawa Timur

References

Arruan, A., Sompie, B. F., Sibi, M., & Pratasis, P. (2014). Analisa Koefisien Harga Satuan Tenaga Kerja Di Lapangan Dengan Membandingkan Analisis SNI Dan Analisis BOW Pada Pembesian Dan Bekisting Kolom. Jurnal Sipil Statik, Vol. 2(2), 81–93. https://ejournal.unsrat.ac.id/index.php/jss/article/view/4680

Bamayi, W. J., Kartika, N., & Robial, S. M. (2022). Productivity Analysis Of Floor Heroning Workers Using Work Sampling Method. Jurnal Pensil : Pendidikan Teknik Sipil, 11(2), 162–170. https://doi.org/10.21009/jpensil.v11i2.25474

Desfita, M., & Hamid, F. (2021). Work Sampling Methods Dalam Analisis Produktivitas Tenaga Kerja Konstruksi Proyek Pembangunan Gedung (Studi Kasus : Proyek Pembangunan Gedung Kuliah Baiturrahmah). Jurnal Teknologi Dan Sistem Informasi Bisnis, 3(1), 259–266. https://doi.org/10.47233/jteksis.v3i1.223

Harun, M. (2013). Analisa Produktifitas Tenaga Kerja Pada Pekerjaan Konstruksi Gedung. Jurnal Ilmiah MITSU, 1(2). https://doi.org/10.24929/ft.v1i2.60

Lalujan, A. N., & Sutandi, A. (2022). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Penulangan Di Kota Manado Dengan Metode Work Sampling. JMTS: Jurnal Mitra Teknik Sipil, 5(3), 661–670. https://doi.org/10.24912/jmts.v5i3.16577

Liespono, A., & Tjendani, H. T. (2023). Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling Pada Proyek Pembangunan Perumahan Pakuwon City Surabaya. Journal of Scientech Research and Development, 5(2). https://doi.org/10.56670/jsrd.v5i2.241

Parulian, J., Sibi, H. M., & Inkiriwang, R. L. (2017). Analisis Produktivitas Tenaga Kerja Konstruksi Pada Pekerjaan Pasangan Lantai Keramik Dan Plesteran Dinding Menggunakan Metode Work Sampling (Studi Kasus : Bangunan Gedung Pendidikan Fakultas Kedokteran). Jurnal Sipil Statik, Vol. 5, 205–214. https://ejournal.unsrat.ac.id/v2/index.php/jss/article/view/16250

Prasetyo, D. A., Anthony, A., Chandra, H. P., & Ratnawidjaja, S. (2017). Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling : Studi Kasus Proyek Tunjungan Plaza 6. Jurnal Dimensi Pratama Teknik, Vol. 6(1). https://publication.petra.ac.id/index.php/teknik-sipil/article/view/5359

Rori, G., Walangitan, D. R. O., & Inkiriwang, R. L. (2020). Analisis Perbandingan Biaya Material Pekerjaan Pasangan Dinding Bata Merah Dengan Bata Ringan. Jurnal Sipil Statik, Vol. 8(3), 311–318. https://ejournal.unsrat.ac.id/v2/index.php/jss/article/view/28749

Setyabudhi, A. L. (2022). Determining Service Needs for xxx Students in Batam Using Work Sampling. Engineering and Technology International Journal, 4(01), 1–7. https://doi.org/10.55642/eatij.v4i01.159

Sutalaksana, I. Z., Anggawisastra, R., & Tjakraatmadja, J. H. (2006). Teknik Perancangan Sistem Kerja (Edisi Kedua). ITB.

Sutiko, A., Suprapto, H., & Zainuddin, D. (2021). Analisis Produktivitas dan Beban Kerja Operator Produksi dengan Metode Work Sampling dan NASA-TLX di PT. Tokai Dharma Indonesia Plant II. Jurnal Optimasi Teknik Industri (JOTI), 3(2), 49. https://doi.org/10.30998/joti.v3i2.10026

Syahrir, R. A., Gelatan, L., Fitriani, T., Narew, I., & Tomu, A. (2023). Analisis Tingkat Produktivitas Karyawan Sebelum Dan Sesudah Penerapan Konsep Lean Manufacture Pada PT Sanggar Sarana Baja. Journal of Economic, Bussines and Accounting (COSTING), 7(1), 274–290. https://doi.org/10.31539/costing.v7i1.6004

Yanti, G. (2017). Produktivitas Tenaga Kerja Dengan Metode Work Sampling Proyek Perumahan Di Kota Pekanbaru. SIKLUS: Jurnal Teknik Sipil, 3(2), 100–106. https://doi.org/10.31849/siklus.v3i2.385

Downloads

Published

04-01-2025